Cost

  • albedo: According to our administration/controlling albedo costs 10€/node/day. You can use this value in your proposals.
    (Included are: Anschaffungskosten, Wartungskosten, Raumkosten (Fläche), Personalkosten, Stromverbrauch)

Power

  • Approximate values
  • ∑ column includes switches, management nodes and storage
  • Cost is estimated by the assumption that AWI pays 0.25 ¢/kWh:
    24 h/d · 365 d/yr · 0.25¢/kW · power_consumption

albedoalbedo∑ albedoUnitollie∑ ollie

1 node
without HT
1 node
with HT
240 nodes
á 128 cores

1 node316 nodes
á 36 cores
idle0.180.2261.1kW0.1137
performing0.470.48130.0kW0.40120
cost/yr


284700
262800