  • Approximate values
  • ∑ column includes switches, management nodes and storage
  • Cost is estimated by the assumption that AWI pays 0.25 ¢/kWh:
    24 h/d · 365 d/yr · 0.25¢/kW · power_consumption

albedoalbedo∑ albedoUnitollie∑ ollie

1 node
without HT
1 node
with HT
240 nodes
á 128 cores

1 node316 nodes
á 36 cores
idle0.180.2261.1kW0.1137
performing0.470.48130.0kW0.40120
cost


284700
262800
  • No labels