- Approximate values
- ∑ column includes switches, management nodes and storage
- Cost is estimated by the assumption that AWI pays 0.25 ¢/kWh:
24 h/d · 365 d/yr · 0.25¢/kW · power_consumption
albedo | albedo | ∑ albedo | Unit | ollie | ∑ ollie | |
---|---|---|---|---|---|---|
1 node without HT | 1 node with HT | 240 nodes a 128 cores | 1 node | 316 nodes a 36 cores | ||
idle | 0.18 | 0.22 | 61.1 | kW | 0.11 | 37 |
performing | 0.47 | 0.48 | 130.0 | kW | 0.40 | 120 |
cost |
| 284700 | € | 262800 |