Cost
- albedo: According to our administration/controlling albedo costs 10€/node/day. You can use this value in your proposals.
(Included are: Anschaffungskosten, Wartungskosten, Raumkosten (Fläche), Personalkosten, Stromverbrauch)
Power
- Approximate values
- ∑ column includes switches, management nodes and storage
- Cost is estimated by the assumption that AWI pays 0.25 ¢/kWh:
24 h/d · 365 d/yr · 0.25¢/kW · power_consumption
albedo | albedo | ∑ albedo | Unit | ollie | ∑ ollie | ||
---|---|---|---|---|---|---|---|
1 node without HT | 1 node with HT | 240 nodes a á 128 cores | 1 node | 316 nodes a á 36 cores | |||
idle | 0.18 | 0.22 | 61.1 | kW | 0.11 | 37 | |
performing | 0.47 | 0.48 | 130.0 | kW | 0.40 | 120 | |
cost | /yr | 284700 | € | 262800 |