...
- Winch control room: Winch control; CTD operation; (Slave) operation of multibeam echo sounder system Hydrosweep DS3; (Slave) operation of sediment echo sounder system of Sediment Echo Sounder (Parasound P70) ; (Slave) operation of Fishing Echo Sounder (Simrad EK 60 / EK 80) ; patch field for electric interface to winch cables and to other labs (A-113, aerologie-lab)
- Winch fore room: A4 printer
- Backward winch control room
- Galley
- Mess room I and bar "Zillertal"
- Compressor room
- Petrol store
- Suitcase store
- Dangerous goods room (class 2)
- Dangerous goods room (class 8 and class 9)
- Dangerous goods stores - outside cabins on foredeck (class 4 and class 5)
...
- Cargo room 1: space for 10x 20' containers
- Science store: storing of dewars for Liquid Nitrogen; (Liquid Nitrogen Generator will be installed in 2019/07); Reference gases for pCO2 devices; moon pool device carriers; hydroacoustic underwater positioning systems; wave buoy
- E-525A - Electronics for hydroacoustic systems:
Multibeam echo sounder Echo Sounder (Hydrosweep DS3); Sediment echo sounder Echo Sounder (Parasound P70) ; Underwater positioning systems IXBLUE Posidonia 6000 and IXBLUE GAPS; Synchronization unit SyncUnit . - E-550 - Hydroacoustic office:
Operation of: hydroacoustic systems: Multibeam echo sounder system Multibeam Echo Sounder (Hydrosweep DS3) ; Sediment echo sounder Echo Sounder (Parasound P70) ; Operation of Fishing Echo Sounder (Simrad EK 60 / EK 80) ; Acoustic Doppler Current Profiler (ADCP); Synchronization unitSyncUnit ; additionally 2 PC workplaces for bathymetry.(with Valeport Midas SVP (with Sound Velocity Probe (MIDAS SVP) interface) - User room: equpped with several computers with Microsoft Windows and Apple; A3 printer; PCs with Internet connectivity.
- System manager room: Operation and control of nearly all IT infrastructure
- Server room: All servers and network devices; A0 plotter
- Wet lab I: 2x Fume hood; Connectivity to sea water; incubator; patch field for electric interface to other labs (winch room, aerologie-lab, A-113);
In July 2019 water purification systems Millipore Elix Essential 5 and Milli-Q Q7000 will be installed. - Wet lab II: -80° freezer; Crush ice generator
- Chemical lab: MilliPore pure water systems (type 2 and type 1); Fume hood; freezer
- Salinometer room: 2x Optimare precision salinometer; Valeport Midas SVP
- Dangerous goods room
- Telephone office II
- Moon pool room
- Pulser station
- CTD station
- Friction room: friction winch GE51.1/GE51.2; Winches GE72.1, FN62.1 and FN62.2;
- Working corridor: Waste station
- Working deck: Deck winches (EL031, SE032.1; SE032.2; EL030 (dedicated for Multinet) or AWI-030 (with Dyneema rope); net winch; mooring winch and horizontal capstan; Place for 4 containers, Operation of devices lift up with 5t and 20t side bars; rear stern ramp.
- Decks work shop
...
- G-707 - Water supply for:
4H 4H-Jena FerryBox; pCO2 analyzer Monitoring System General Oceanics ; pCO2 analyzer SubCtech - Cross propeller tunnel room:
Particle Filer AutoFIM - Engine Control Room
- Public laundry
...