Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  • Winch control room: Winch control;  CTD operation; (Slave) operation of multibeam echo sounder system Hydrosweep DS3; (Slave) operation of sediment echo sounder system of Sediment Echo Sounder (Parasound P70) ; (Slave) operation of Fishing Echo Sounder (Simrad EK 60 / EK 80) ;  patch field for electric interface to winch cables and to other labs (A-113, aerologie-lab)
  • Winch fore room: A4 printer
  • Backward winch control room
  • Galley
  • Mess room I and bar "Zillertal"
  • Compressor room
  • Petrol store
  • Suitcase store
  • Dangerous goods room (class 2)
  • Dangerous goods room (class 8 and class 9)
  • Dangerous goods stores - outside cabins on foredeck (class 4 and class 5)

...

  • Cargo room 1: space for 10x 20' containers
  • Science store: storing of dewars for Liquid Nitrogen; (Liquid Nitrogen Generator will be installed in 2019/07); Reference gases for pCO2 devices;  moon pool device carriers;  hydroacoustic underwater positioning systems;  wave buoy
  • E-525A - Electronics for hydroacoustic systems:
    Multibeam echo sounder Echo Sounder (Hydrosweep DS3)Sediment echo sounder Echo Sounder (Parasound P70) ;  Underwater positioning systems IXBLUE Posidonia 6000 and IXBLUE GAPS; Synchronization unit SyncUnit .
  • E-550 - Hydroacoustic office:
    Operation of: hydroacoustic systems: Multibeam echo sounder system  Multibeam Echo Sounder (Hydrosweep DS3) Sediment echo sounder Echo Sounder (Parasound P70)Operation of  Fishing Echo Sounder (Simrad EK 60 / EK 80) ; Acoustic Doppler Current Profiler (ADCP) Synchronization unitSyncUnit ;  additionally 2 PC workplaces for bathymetry.(with Valeport Midas SVP (with Sound Velocity Probe (MIDAS SVP) interface) 
  • User room: equpped with several computers with Microsoft Windows and Apple; A3 printer;  PCs with Internet connectivity.
  • System manager room: Operation and control of nearly all IT infrastructure
  • Server room: All servers and network devices;  A0 plotter
  • Wet lab I: 2x Fume hood;  Connectivity to sea water;  incubator;  patch field for electric interface to other labs (winch room, aerologie-lab, A-113); 
    In July 2019 water purification systems Millipore Elix Essential 5 and Milli-Q Q7000 will be installed.
  • Wet lab II: -80° freezer; Crush ice generator
  • Chemical lab: MilliPore pure water systems (type 2 and type 1);  Fume hood;  freezer
  • Salinometer room: 2x Optimare precision salinometer;  Valeport Midas SVP
  • Dangerous goods room
  • Telephone office II
  • Moon pool room
  • Pulser station
  • CTD station
  • Friction room: friction winch GE51.1/GE51.2;  Winches GE72.1, FN62.1 and FN62.2;
  • Working corridor: Waste station
  • Working deck: Deck winches (EL031, SE032.1; SE032.2; EL030 (dedicated for Multinet) or AWI-030 (with Dyneema rope); net winch; mooring winch and horizontal capstan;  Place for 4 containers, Operation of devices lift up with 5t and 20t side bars; rear stern ramp.
  • Decks work shop

...

  • G-707 - Water supply for:
    4H 4H-Jena FerryBox; pCO2 analyzer Monitoring System General Oceanics ;  pCO2 analyzer SubCtech
  • Cross propeller tunnel room:
    Particle Filer AutoFIM
  • Engine Control Room
  • Public laundry

...